09 Mar 2015

Resin Bonded Driveway

A question about : Resin Bonded Driveway

Hi,

I have received a quote from a local reputable company who specialise in resin bonded driveways. They have quoted an equivalent of Ј125 per sq m.

This is for:
Excavation and much away
Hardcore and compaction
Tarmac preparation layer
Resin bonded finish
Block paving as a soldier course at the entrance and stretcher course around the perimeter.
10 year guarantee
estimated 1 week's effort for a team of 4

The area is 120 sq meters.

09 Mar 2015

Fascias, Soffits, Guttering, Pointing and Bay Window Roof Replacement

A question about : Fascias, Soffits, Guttering, Pointing and Bay Window Roof Replacement

Hi everybody,

I've had a couple of quotes regarding a rather large job including:


Complete removal and replacement of fascias, soffits and fascias on a three bedroom end of terrace (more or less semi-detached)
Repointing of the chimney, including a new cowl
Complete replacement of bay window roof with insulation, new wood beams and fibre glass, including new guttering

Total: Ј2550

09 Mar 2015

good price? labour only to replace gravity fed system with combi

A question about : good price? labour only to replace gravity fed system with combi

I have found a leak from our hot water tank which has been leaking for a while now!! noticed due to a stain appearing on the ceiling!! anyhow. we have a gravity fed system which we are going to rip out and replace with a combi. we have a quote of Ј750 for the work inc bits (not the boiler timer and flue) he says it will be a 2-3 day job. I am assuming that this is ok? or actually really good?

09 Mar 2015

I am not sure which tray to ask?? Recomedation please?

A question about : I am not sure which tray to ask?? Recomedation please?

My shower room current have wall tiles.
The grout start coming off a bit and it is a bit mouldy.

I am consider removing at wall tiles around shower, area about 2 x 900 x 900 x 2300 & 1200 x 2300. And replacing it with shower panels.

Which trade should I ask? Bathroom fitter? Plumber?

Any idea how long it will takes?